FMCG Facility – Cape Town

Date 2017 December

Area Size 5 800 m2

Client Engineering Firm

Final Deliverable : Registered Point Cloud – full colour in. RCP format

The aim was to obtain a high resolution pointcloud to provide an accurate platform for further design works and clash detection by client in the installation of new plant equipment.

 

Time was a critical factor in the appointment of this project.

The plant was in continual production and a shut down for an extended period would have had a significantly negative impact on operations, being of a FMCG nature.

The scope of work encompassed the scanning of the entire production facility, associated office and roof spaces with emphasis on the color coded Hvac and reticulation systems therein.

Of significant importance was the relationship between slab levels of the facilities being amalgamated.

  • Time on Site: 2 days
  • Number of Scans: 177 Colour
  • Final file delivery: 10 days
  • File package:   .RCP 168GB